MRU GmbH
SWG 100 User Manual
Page
26
of
155
Reference
1. Front ferrule
2. Back ferrule
3. Nut
4. Tube insert
5. Flexible PTFE-tube
6. Nut
7. Ferrule
Installation of the sample probe (1)
1.
Connect the PTFE-tube with the gas inlet. To do that, unscrew the nut from the gas inlet and plug one
end of the PTFE-tube of the gas inlet and screw the nut of the gas inlet.
2.
Connect the other end of the PTFE-tube with the LD-probe. The LD-probe has a swagelock fitting
(1/8G). See sketch below.
6. Connect the installed sampling probe with the flange tube assembly.
1
2
3
4
5
6
7
5
Содержание SWG100 CEM
Страница 1: ...SWG100 User Manual MRU GmbH D 74172 Neckarsulm ...
Страница 2: ...MRU GmbH SWG 100 User Manual MRU GmbH D 74172 Neckarsulm 2 155 ...
Страница 98: ...MRU GmbH SWG 100 User Manual Page 98 of 155 Hardware state tests 1 2 3 4 5 6 7 8 9 2 3 4 5 6 7 8 9 1 ...
Страница 102: ......
Страница 135: ...MRU GmbH SWG 100 User Manual Page 135 of 155 13 3 Option O2 paramagnetic cell measurement 0 25 00 ...
Страница 142: ...MRU GmbH SWG 100 User Manual Page 142 of 155 13 10 Option NDIR bench for CO2 analysis 0 100 ...
Страница 154: ...MRU GmbH SWG 100 User Manual Page 154 of 155 14 Declaration of conformity ...
Страница 155: ...MRU GmbH SWG 100 User Manual Page 155 of 155 V1 00 EN ...