4-11
4-11
Frame servicing
Installation
Install the fork tube.
Raise the fork through the bottom bridge and top bridge.
Place the fork tubes in the top clamp level as shown in
the picture.
(1) FORK TUBE
(2) TOP BRIDGE
Tighten the bottom bridge pinch bolts to the specified
torque.
Torque: 21 N•m (2.1 kgf•m, 14 lbf•ft)
Overtightening the pinch bolts can deform the outer tube.
Deformed outer tube must be replaced.
Tighten the fork bolt.
Tighten the top bridge pinch bolt to the specified torque.
Torque: 21 N•m (2.1 kgf•m, 14 lbf•ft)
Return spring pre-load and rebound adjuster to their
original positions as noted during removal.
Install the following:
– Front fender
– Front wheel (page 4-2)
(1) BOTTOM BRIDGE PINCH BOLTS
(2) FORK BOLT
(3) TOP BRIDGE PINCH BOLTS
Steering stem
Disassembly
Remove the following:
– Handlebar
– Front wheel (page 4-1)
– Front fender
Remove the steering stem nut and washer.
Remove the fork legs (page 4-2).
Remove the top bridge.
(1) STEM NUT
(2) TOP BRIDGE
FORWARD
2
1
3
2
1
1
2
1
Содержание 4Ride MST260 2016
Страница 1: ...PGM FI Racing Trial Shop Manual 2016 ...
Страница 2: ......
Страница 7: ...Labels 4 3 5 2 1 7 6 ...
Страница 28: ...Service data 1 20 1 20 1 FUEL FEED HOSE 2 TRANSMISSION BREATHER HOSE 1 2 ...
Страница 108: ...3 62 3 62 Memo ...
Страница 157: ...Memo 5 17 5 17 Memo ...
Страница 158: ......