5. Connect all the hoses according to the plumbing schematic.
Install Hydraulic Flow Control Valve - continued
Solenoid Valve Unit
Hydraulic Cylinder
Adapter Plate
PORT “B” CONTROL ELEMENT PORT “A”
VP OPEN PORT (LOWER)
VP CLOSE PORT (TOP)
VP OPEN PORT
VP CLOSE PORT
Figure 5-17
Hydraulic flow control valve - connections
5-53
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.
ASSEMBLY
FSG2 User Manual
Содержание Fusion G2
Страница 1: ...version 14 User Manual Original Instructions...
Страница 2: ......
Страница 10: ......
Страница 64: ......
Страница 151: ......