10. Install two M12 swivel hoist rings into the screw gearbox adapter ring.
11. Remove the vertical beam from the crate. Remove the swivel hoist rings.
12. Attach lifting bar to vertical beam. Attach a 4 in. web sling (supplied) to
each end of the lifting bar with a choker configuration.
13. Lift the vertical beam with two lifting devices. If a crane and forklift are
used, the crane should lift the lifting bar end.
14. Change the beam orientation so that the beam is vertical with the lifting
bar at the top.
IMPORTANT
Take care that the nozzle does not touch the ground.
ER3 / ER4 Installation - continued
11-21
E-MULTI RADIAL OPTION
E-Multi User Manual