5.2 Unpacking
1. The crate should be moved using a forklift or pallet truck. If using a crane,
the crate must be slung from underneath. Do not lift from the top of the
crate.
2. Remove accessory boxes, manual and anything other than the E-Multi
injection unit.
3. Remove plastic wrap as necessary.
4.
Remove the four 3/8” lag screws from the ends of the shipping brackets
using a 14 mm (9/16 in.) hex socket.
5. The E-Multi injection unit ships with lifting hardware installed. Use a two
leg chain bridle to remove the E-Multi injection unit from the crate. See
“E-Multi Weight Specifications” on page 3-20.
5.3 Inspection
1. Check that the E-Multi injection unit has not been damaged in transit.
2. Check all wires and cables. Ensure they are not kinked or damaged and
are still connected properly.
3.
Check for oil leaks on the machine. If oil is visible, find the source of the
leak and correct. Check oil level. See “Check the Oil Bath Level” on page
5-2