3.16.4 Vertical Orientation with Two Lifting Machines
WARNING
Do not leave the E-Multi injection unit standing vertically without support.
This is dangerous and can result in serious injury if the unit falls over.
This is the preferred method to raise the EM4 to a vertical position.
1. Attach the slings from the lifting bar to the lifting machine.
2. Connect slings to the barrel end of the support beam using two 25 mm
(1 in.) shackles in the lifting holes.
3. Attach the barrel end slings to the other lifting machine.
4. At the same rate, slowly lift the E-Multi injection unit with both lifting
machines. Keep the lifting machines centered over their respective lifting
point.
5.
Lift approximately 30 cm (1 ft) off of the floor.
6. Lift the motor end of the unit. Keep the lifting machines centered over
their respective lifting point.
3-27
SAFETY
E-Multi User Manual
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.