22. Feed the new heater cables through the strain relief on the connector
base.
1
2
3
1. Connector base
2. Strain relief
3. Heater wires
23. Reinstall the connector base onto the support beam.
24. Install new wire ties.
25. Tighten the lock nut on the strain relief.
26. Insert the heater wires into the terminals on the connector insert and
tighten.
27. Reinstall the connector insert.
28. Test heater resistance using a multimeter on the connector insert pins.
29. Reinstall the barrel cover(s).
NOTE
Ensure that there is no interference with heater and thermocouple wires.
9-26
E-Multi User Manual
MAINTENANCE
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.