13. Heavy Duty Stand
- If necessary, the top leveling plate may be adjusted
in order to obtain fine leveling alignment. The SHCS should be loosened
only enough to allow the plate to be raised and leveled by the set screws.
After final leveling, the locking screws must be torqued to the levels found
2
3
4
1
1. Set screws
2. Locking screws
3. Top leveling plate
4. Bottom leveling plate
14. Heavy Duty Stand
- Slowly lower the stabilizing leg until it makes light
contact with the floor, then tighten the adjusting screw by a 1/2 turn more.
Do not overtighten this screw or it will raise the leveling castors off the
floor. Verify that each castor is in full contact with the floor.
2
1
1. Stabilizing leg
2. Stabilizing leg adjusting
screw
15. Verify that the load is stable, and fully supported by the stand and the
mold. Once this is verified, the attachment to the crane may be removed.