(21) Heating high pressure control
(a) Starting condition
When the indoor heat exchanger temperature (Th2) has become higher than the start temperature for 1 minute continuously.
(b) Contents of control
Compressor stop
(c) Release condition
When the indoor heat exchanger temperature (Th2) has become lower than the release temperature.
Item
Room
temperature (Th1)
Release temperature
Start temperature
Th1 <= 24°C
48.5°C
62°C
24°C < Th1<=27°C
47.5°C
61°C
27°C < Th1
46.5°C
60°C
(22) Heating overload protective control
(a) Operating conditions
(b) Detail of operation
(c) Reset condition
Tho-A
Tho-A
(Upper limit 9th speed)
(12) Current cut
(a) Purpose:
(b) Detail of operation:
(13) Outdoor unit failure
(23) Indoor fan motor protection
compressor command
300
-
(Model SCM40, 45, 50, 60, 71, 80 only)
min
-1
-
160
-
'16 • SCM-T-199
Содержание SCM40ZS-S
Страница 114: ...113 16 SCM T 199 source PJA012D783...
Страница 200: ...199 16 SCM T 199 4 Troubleshooting procedure If the air conditioner runs NO NO NO NO YES YES YES YES 200 201 207 201 207...
Страница 285: ...284 16 SCM T 199 B PJZ012D077 2 Model RC EX1A eco touch REMOTE CONTROL RC EX1A INSTALLATION MANUAL...
Страница 311: ...310 16 SCM T 199 4 10 5 Superlink E board SC ADNA E F SL2NA E and SL4 AE BE to control...
Страница 312: ...311 16 SCM T 199...