-
4
-
'16 • SCM-T-199
.........................................................160
(22) Heating overload protective control
...............................................................162
7.3.1 Operation control function by wireless remote control
(3) Custom cord switching procedure
...............................................................................162
7.3.2 Operation control function by indoor control ..
...............................162
..............................................................167
.............................................................................163
.................................................................................163
...........................173
7.4.3 Operation control function by the indoor control
7.4.2 Operation control function by the wired remote control .................170
7.4.1 Remote control (Option parts) ...........................................................167
(8) Determining the operating mode .............................................................164
(9) Outline of dehumidifying (DRY) operation ...............................................165
(10) Outline of automatic operation ...............................................................165
(11) Hot keep operation ................................................................................166
(13) Heating high pressure control
..............................................................166
.....................................................166
(15) Indoor fan motor protection
..................................................................166
(14) Heating overload protective control
(1) Auto operation .........................................................................................173
(2) Operations of functional items during cooling/heating ............................174
(4) Timer operation .......................................................................................175
(5) Remote control display during the operation stop ....................................176
(6) Hot start (Cold draft prevention at heating) ............................................176
(7) Hot keep ..................................................................................................176
(3) Dehumidifying (DRY) operation ..............................................................174
Содержание SCM40ZS-S
Страница 114: ...113 16 SCM T 199 source PJA012D783...
Страница 200: ...199 16 SCM T 199 4 Troubleshooting procedure If the air conditioner runs NO NO NO NO YES YES YES YES 200 201 207 201 207...
Страница 285: ...284 16 SCM T 199 B PJZ012D077 2 Model RC EX1A eco touch REMOTE CONTROL RC EX1A INSTALLATION MANUAL...
Страница 311: ...310 16 SCM T 199 4 10 5 Superlink E board SC ADNA E F SL2NA E and SL4 AE BE to control...
Страница 312: ...311 16 SCM T 199...