4. CONNECTION TO FUJI PLC
4.5 PLC Side Setting
4 - 17
4
CONNEC
T
ION T
O
FUJI PLC
(2) Setting of the station No.
Make the station No. using RS-485 station No.
switches.
(3) Connecting terminating
resistors
Turn ON/OFF the terminating resistor using RS-485
terminating resistor ON/OFF switch.
(4) Setting of Transmission speed, Stop bit, Data bit,
Parity bit, Initializing method
Make the settings using the character configuration
switches.
4.5.4
Connecting to FFK120A-C10
Communication settings
Make the communication settings using setting
switches.
*1
Adjust the settings with GOT settings.
*2
Avoid duplication of the station No. with any of the other
units.
*3
Turn ON the terminating switch of a general-purpose
interface module which will be a terminal.
*4
Set as necessary.
Settings by switch
Make the communication settings using each setting
switch.
Station No.
0 to 99
Setting item
Set value
Switch No.
1
2
3
4
5
6
7
8
Transmission
speed
9600bps
ON OFF ON
19200bps
OFF ON
ON
Stop bit
1bit
ON
2bits
OFF
Data bit
7bits
ON
8bits
OFF
Parity bit
Even
ON
Odd
OFF
Done
ON
None
OFF
Initializing
method
By switch
ON
ON
8
7
6
5
4
3
2
1
ON
Item
Set value
MODE
*4
Command-setting-type start-stop
synchronization, nonsequence format
RS-232C 1:1
Command-setting-type start-stop
synchronization, nonsequence format
RS-232C 1:1,
and RS-485 1:N
Command-setting-type start-stop
synchronization, nonsequence format
RS-485 1:N
Transmission speed
*1
9600bps, 19200bps
Data bit
*1
8bits or 7bits
Parity bit
*1
Even or Odd
Done, None
Stop bit
*1
1bit, 2bits
Initializing method
By switch
Station No.
*1*2
0 to 99
Terminating resistor
*3
ON or OFF
T-link channel switch
FUJI PLC user's Manual
T-link terminating resistor
MODE switch
RS-485 station No.
switches
RS-485 terminating resistor
ON/OFF switch
Character configuration
switches
T-link terminating resistor
ON/OFF switch
T-link channel switch
Baudrate setting switch
Содержание GOT2000Series
Страница 2: ......
Страница 17: ...A 15 REVISIONS WARRANTY...
Страница 52: ...1 30 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring...
Страница 54: ......
Страница 78: ...3 10 3 CONNECTION TO HITACHI PLC 3 6 Device Range that Can Be Set...
Страница 100: ...4 22 4 CONNECTION TO FUJI PLC 4 7 Precautions...
Страница 174: ...7 24 7 CONNECTION TO YOKOGAWA PLC 7 4 Device Range that Can Be Set...
Страница 262: ...9 54 9 CONNECTION TO RKC TEMPERATURE CONTROLLER 9 7 Precautions...
Страница 280: ...10 18 10 CONNECTION TO ALLEN BRADLEY PLC 10 4 Device Range that Can Be Set...
Страница 296: ...11 16 11 CONNECTION TO GE PLC 11 7 Precautions...
Страница 308: ...12 12 12 CONNECTION TO LS INDUSTRIAL SYSTEMS PLC 12 6 Device Range that Can Be Set...
Страница 332: ...14 18 14 CONNECTION TO SIEMENS PLC 14 4 Device Range that Can Be Set...
Страница 334: ...REVISIONS 2...
Страница 337: ......