![Mitsubishi GOT2000Series Скачать руководство пользователя страница 294](http://html1.mh-extra.com/html/mitsubishi/got2000series/got2000series_connection-manual_1809187294.webp)
11 - 14
11. CONNECTION TO GE PLC
11.5 PLC Side Setting
11.5.3
Connecting to IC693CMM311
Communication settings
Make the communication settings using the
engineering tool.
When making the settings, set [Configuration Mode] on
the [Setting] tab of the engineering tool to "SNP only".
*1
Set to YES.
*2
Set to SLAVE.
*3
Set the communication format to be used.
(only when connecting to Port2)
*4
Set to NONE.
*5
Set to NONE.
*6
Set to LONG.
11.5.4
Connecting to IC697CMM711
Communication settings
Make the communication settings using the
engineering tool.
When making the settings, set [Configuration Mode] on
the [Setting] tab of the engineering tool to "SNP only".
*1
Set to YES.
*2
Set to SLAVE.
*3
Set the communication format to be used.
(only when connecting to Port2)
*4
Set to NONE.
*5
Set to NONE.
*6
Set to LONG.
11.5.5
Station number setting
Set each station number so that no station number
overlaps.
The station number can be set without regard to the cable
connection order. There is no problem even if station
numbers are not consecutive.
(1) Direct specification
Specify the station No. of the PLC to be changed when
setting device.
POINT
POINT
POINT
PLC Station No. settings
Make sure to set a 2-digit number for the station No. of
the PLC to be monitored by the GOT.
Setting item
PLC side setting
SNP Enable
*1
YES
SNP Mode
*2
Slave
Interface
*3
RS232, RS485
Data Rate
9600bps, 19200bps
Parity
ODD, NONE, EVEN
Stop Bits
1bit, 2bits
Flow Control
*4
NONE
Turn Around Delay
*5
NONE
Timeout
*6
Long
Setting item
PLC side setting
SNP Enable
*1
YES
SNP Mode
*2
Slave
Interface
*3
RS232, RS485
Data Rate
9600bps, 19200bps
Parity
ODD, NONE, EVEN
Stop Bits
1bit, 2bits
Flow Control
*4
NONE
Turn Around Delay
*5
NONE
Timeout
*6
Long
Specification range
00 to 31
GOT
Station
No.3
Station
No.00
Station
No.15
Station
No.6
Examples of station number setting
Содержание GOT2000Series
Страница 2: ......
Страница 17: ...A 15 REVISIONS WARRANTY...
Страница 52: ...1 30 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring...
Страница 54: ......
Страница 78: ...3 10 3 CONNECTION TO HITACHI PLC 3 6 Device Range that Can Be Set...
Страница 100: ...4 22 4 CONNECTION TO FUJI PLC 4 7 Precautions...
Страница 174: ...7 24 7 CONNECTION TO YOKOGAWA PLC 7 4 Device Range that Can Be Set...
Страница 262: ...9 54 9 CONNECTION TO RKC TEMPERATURE CONTROLLER 9 7 Precautions...
Страница 280: ...10 18 10 CONNECTION TO ALLEN BRADLEY PLC 10 4 Device Range that Can Be Set...
Страница 296: ...11 16 11 CONNECTION TO GE PLC 11 7 Precautions...
Страница 308: ...12 12 12 CONNECTION TO LS INDUSTRIAL SYSTEMS PLC 12 6 Device Range that Can Be Set...
Страница 332: ...14 18 14 CONNECTION TO SIEMENS PLC 14 4 Device Range that Can Be Set...
Страница 334: ...REVISIONS 2...
Страница 337: ......