![Mitsubishi GOT2000Series Скачать руководство пользователя страница 276](http://html1.mh-extra.com/html/mitsubishi/got2000series/got2000series_connection-manual_1809187276.webp)
10 - 14
10. CONNECTION TO ALLEN-BRADLEY PLC
10.3 Ethernet Connection
10.3.3
PLC side setting
POINT
POINT
POINT
ALLEN-BRADLEY PLC
For details of ALLEN-BRADLEY PLCs, refer to the
following manuals.
ALLEN-BRADLEY PLC user's Manual
Parameter setting
Set the following parameters with the software package
manufactured by the Allen-Bradley.
*1
For the IP address, make the same setting as that of each
Ethernet module set on GT Designer3.
Do not set the same IP Address as those of GOT and
controller on the Ethernet network.
For the address setting on GT Designer3, refer to the
following.
11.3.2
■
10.3.4
Precautions
When setting IP address
Do not use "0" and "255" at the end of an IP address.
(Numbers of *.*.*.0 and *.*.*.255 are used by the
system.)
The GOT may not monitor the controller correctly with
the above numbers.
Consult with the administrator of the network before
setting an IP address to the GOT and controller.
When connecting to multiple GOTs
(1) Setting Station
When connecting two or more GOTs in the Ethernet
network, set each [Station] to the GOT.
(2) Setting IP address
Do not use the IP address "192.168.3.18" when using
multiple GOTs.
A communication error may occur on the GOT with the
IP address.
When connecting to the multiple network
equipment (including GOT) in a segment
By increasing the network load, the transmission speed
between the GOT and PLC may be reduced.
The following actions may improve the communication
performance.
• Using a switching hub
• More high speed by 100BASE-TX
(100Mbps)Reduction of the monitoring points on GOT
Item
Setting details
Name
Sets the name.
IP Address
IP address of the connected module
*1
Slot
Slots No. for installing the EtherNet/IP communication
module
Содержание GOT2000Series
Страница 2: ......
Страница 17: ...A 15 REVISIONS WARRANTY...
Страница 52: ...1 30 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring...
Страница 54: ......
Страница 78: ...3 10 3 CONNECTION TO HITACHI PLC 3 6 Device Range that Can Be Set...
Страница 100: ...4 22 4 CONNECTION TO FUJI PLC 4 7 Precautions...
Страница 174: ...7 24 7 CONNECTION TO YOKOGAWA PLC 7 4 Device Range that Can Be Set...
Страница 262: ...9 54 9 CONNECTION TO RKC TEMPERATURE CONTROLLER 9 7 Precautions...
Страница 280: ...10 18 10 CONNECTION TO ALLEN BRADLEY PLC 10 4 Device Range that Can Be Set...
Страница 296: ...11 16 11 CONNECTION TO GE PLC 11 7 Precautions...
Страница 308: ...12 12 12 CONNECTION TO LS INDUSTRIAL SYSTEMS PLC 12 6 Device Range that Can Be Set...
Страница 332: ...14 18 14 CONNECTION TO SIEMENS PLC 14 4 Device Range that Can Be Set...
Страница 334: ...REVISIONS 2...
Страница 337: ......