![Mitsubishi GOT2000Series Скачать руководство пользователя страница 44](http://html1.mh-extra.com/html/mitsubishi/got2000series/got2000series_connection-manual_1809187044.webp)
1 - 22
1. PREPARATORY PROCEDURES FOR MONITORING
1.5 Verifying GOT Recognizes Connected Equipment
1.5
Verifying GOT Recognizes Connected Equipment
Verify the GOT recognizes controllers on [Communication Settings] of the Utility.
• Channel number of communication interface, communication drivers allocation status
• Communication unit installation status
For details on the Utility, refer to the following manual.
GOT2000 Series User's Manual (Utility)
1.
After powering up the GOT, touch [GOT basic
set]
[Controller] from the Utility.
2.
The [Communication Settings] appears.
3.
Verify that the communication driver name to
be used is displayed in the communication
interface box to be used.
4.
When the communication driver name is not
displayed normally, carry out the following
procedure again.
1.1Setting the Communication Interface
1.
3.
4.
Содержание GOT2000Series
Страница 2: ......
Страница 17: ...A 15 REVISIONS WARRANTY...
Страница 52: ...1 30 1 PREPARATORY PROCEDURES FOR MONITORING 1 6 Checking for Normal Monitoring...
Страница 54: ......
Страница 78: ...3 10 3 CONNECTION TO HITACHI PLC 3 6 Device Range that Can Be Set...
Страница 100: ...4 22 4 CONNECTION TO FUJI PLC 4 7 Precautions...
Страница 174: ...7 24 7 CONNECTION TO YOKOGAWA PLC 7 4 Device Range that Can Be Set...
Страница 262: ...9 54 9 CONNECTION TO RKC TEMPERATURE CONTROLLER 9 7 Precautions...
Страница 280: ...10 18 10 CONNECTION TO ALLEN BRADLEY PLC 10 4 Device Range that Can Be Set...
Страница 296: ...11 16 11 CONNECTION TO GE PLC 11 7 Precautions...
Страница 308: ...12 12 12 CONNECTION TO LS INDUSTRIAL SYSTEMS PLC 12 6 Device Range that Can Be Set...
Страница 332: ...14 18 14 CONNECTION TO SIEMENS PLC 14 4 Device Range that Can Be Set...
Страница 334: ...REVISIONS 2...
Страница 337: ......