4
SETUP AND PROCEDURES BEFORE OPERATION
4.1 Handling Precautions
4
- 2
1
OV
E
R
VI
EW
2
SYSTE
M
CO
N
F
IG
UR
A
T
IO
N
3
S
P
E
CI
F
ICA
T
ION
S
4
SE
TUP
AN
D
PR
OC
EDU
RES
BE
F
O
RE
O
P
ER
A
T
IO
N
5
UT
ILI
T
Y
P
ACK
AGE
(G
X CO
NFI
G
U
R
A
T
O
R
-
DA
)
6
PROGRAMMING
7
ON
LI
N
E M
O
D
U
LE
CHANGE
8
T
R
OU
B
LES
H
O
O
T
IN
G
(8) Fix the Q66DA-G with module fixing bracket after the Q66DA-G is mounted to the
base unit.
Make sure that the hook at the tip of the module fixing bracket is hooked on the
3rd slit viewed from the front of Q66DA-G.
Tighten the module fixing screw by the specified torque.
Module fixing bracket
Module fixing screw
Q66DA-G
3rd slit
Содержание Q66DA-G
Страница 2: ......
Страница 6: ...A 4 Disposal Precautions CAUTION When disposing of this product treat it as industrial waste ...
Страница 189: ......