83
5. PARAMETERS
5.2 (E) Environment setting parameters
1
2
3
4
5
6
7
8
9
10
NOTE
• The Y95 signal turns ON when any of MT1, MT2 or MT3 is activated. It does not turn OFF unless all of MT1, MT2 and MT3
are cleared.
• If all of MT1, MT2 and MT3 are activated, they are displayed in the priority of "MT1 > MT2 > MT3".
• The cumulative energization time is counted every hour. Energization time of less than 1 h is not counted.
• Changing the terminal assignment using
Pr.190 to Pr.195 (Output terminal function selection)
may affect the other
functions. Set parameters after confirming the function of each terminal.
Parameters referred to
Pr.190 to Pr.195 (Output terminal function selection)
Содержание FR-CC2-N Series
Страница 61: ...60 3 PRECAUTIONS FOR USE OF THE CONVERTER UNIT 3 4 Checklist before starting operation MEMO ...
Страница 137: ...136 5 PARAMETERS 5 10 Checking parameters changed from their initial values initial value change list MEMO ...
Страница 153: ...152 6 PROTECTIVE FUNCTIONS 6 6 Check first when you have a trouble MEMO ...
Страница 165: ...164 7 PRECAUTIONS FOR MAINTENANCE AND INSPECTION 7 2 Measurement of main circuit voltages currents and powers MEMO ...
Страница 171: ...170 8 SPECIFICATIONS 8 3 Outline dimension drawings MEMO ...