13
1. INTRODUCTION
1.2 Component names
1
2
3
4
5
6
7
8
9
10
Symbol
Name
Description
Refer to page
(a)
PU connector
Connects the operation panel (FR-DU08). This connector also enables the
RS-485 communication.
(b)
For manufacturer setting. Do not use.
—
(c)
RS-485 terminals
Enable RS-485 communication.
(d)
Terminating resistor selection
switch (SW1)
Selects whether or not to use the terminating resistor for RS-485
communication.
(e)
For manufacturer setting. Do not use.
—
(f)
Control circuit terminal block
Connects cables for the control circuit.
(g)
EMC filter ON/OFF connector
Turns ON/OFF the EMC filter.
(h)
Main circuit terminal block (for
terminals P and N)
Connected to the inverter.
(i)
Main circuit terminal block (for
terminals R, S, and T)
Connects cables for the main circuit.
(j)
Charge lamp
Stays ON while the power is supplied to the main circuit.
(k)
Alarm lamp
Turns ON when the protective function of the converter unit is activated.
(l)
Power lamp
Stays ON while the power is supplied to the control circuit (R1/L11, S1/L21).
(m)
Upper front cover
Remove this cover for wiring to control circuit terminals, RS-485 terminals,
etc.
(n)
Lower front cover
Remove this cover when removing the upper front cover.
(o)
Upper main circuit terminal cover
(front)
Remove them when connecting cables to terminals P and N.
(p)
Upper main circuit terminal cover
(right)
(q)
Upper main circuit terminal cover
(left)
(r)
Lower main circuit terminal block
cover
Remove it when connecting cables to terminals R/L1, S/L2, and T/L3.
(s)
Cooling fan
Cools the converter unit.
(t)
Accessory cover
Covers the operation panel (FR-DU08) installation area.
(u)
Switches (SW3 and SW4) for
manufacturer setting
Do not change the initial setting (OFF
).
—
OFF
ON
Содержание FR-CC2-N Series
Страница 61: ...60 3 PRECAUTIONS FOR USE OF THE CONVERTER UNIT 3 4 Checklist before starting operation MEMO ...
Страница 137: ...136 5 PARAMETERS 5 10 Checking parameters changed from their initial values initial value change list MEMO ...
Страница 153: ...152 6 PROTECTIVE FUNCTIONS 6 6 Check first when you have a trouble MEMO ...
Страница 165: ...164 7 PRECAUTIONS FOR MAINTENANCE AND INSPECTION 7 2 Measurement of main circuit voltages currents and powers MEMO ...
Страница 171: ...170 8 SPECIFICATIONS 8 3 Outline dimension drawings MEMO ...