49
2. INSTALLATION AND WIRING
2.7 Communication connectors and terminals
1
2
3
4
5
6
7
8
9
10
2.7
Communication connectors and terminals
2.7.1
PU connector
Mounting the operation panel on the enclosure surface
• With a connection cable, you can mount the operation panel on the enclosure surface, and connect it to the converter unit.
Use the option FR-CB2[ ], or connectors and cables available on the market.
(To mount the operation panel, the optional connector (FR-ADP) is required.)
Securely insert one end of the cable into the PU connector and the other end into the connection connector on the
parameter unit or the FR-ADP attached on the operation panel until the stoppers are fixed.
NOTE
• Refer to the following table when fabricating the cable on the user side. Keep the total cable length within 20 m.
• Commercially available products (as of February 2015)
Communication operation
• Using the PU connector as a computer network port enables communication operation from a personal computer, etc.
When the PU connector is used for connection between the converter unit and a personal, FA, or other computer with a
communication cable, a user program can run to monitor the converter unit or read and write parameters.
Communication can be performed with the Mitsubishi inverter protocol (computer link operation).
For the details, refer to
Parameter unit connection cable
(FR-CB2[ ]) (option)
Operation panel
connection connector
(FR-ADP) (option)
Operation panel
(FR-DU08)
Name
Model
Manufacturer
Communication cable
SGLPEV-T (Cat5e/300 m) 24AWG × 4P
Mitsubishi Cable Industries, Ltd.
RJ-45 connector
5-554720-3
Tyco Electronics
Содержание FR-CC2-N Series
Страница 61: ...60 3 PRECAUTIONS FOR USE OF THE CONVERTER UNIT 3 4 Checklist before starting operation MEMO ...
Страница 137: ...136 5 PARAMETERS 5 10 Checking parameters changed from their initial values initial value change list MEMO ...
Страница 153: ...152 6 PROTECTIVE FUNCTIONS 6 6 Check first when you have a trouble MEMO ...
Страница 165: ...164 7 PRECAUTIONS FOR MAINTENANCE AND INSPECTION 7 2 Measurement of main circuit voltages currents and powers MEMO ...
Страница 171: ...170 8 SPECIFICATIONS 8 3 Outline dimension drawings MEMO ...