[8-13 Parts Replacement Instructions ]
84
-
chapter 8
BS_08_E
8 Troub
le
sho
oting Bas
ed on Ob
ser
ved
Sy
mp
toms
2. S, L-module (four-way valve (21S4b))
(23B) To make it easier to connect four-way valve (21S4b), cut the pipe end below the raised hole (cut off the section covered
with brazing filler) on the pipe with a pipe cutter. Cut the pipe with an expanded end that is included with four-way valve
(21S4b) to the same length as the pipe that was removed from the on-site pipe. (See Figure 22.)
(20B) Follow the same procedures ((1) through (8), (9A), and (12A)) for replacing four-way valve (21S4a).
(21B) Remove the pipe below four-way valve (21S4b) and on the front by removing the braze at the two areas shown in
Figure 20.
(22B) Remove four-way valve (21S4b) by removing the braze from the area above four-way valve (21S4b) as shown in Figure
21.
Explained below is the procedure for replacing four-way valve (21S4b) (on the left when seen from the front of the unit).
Secure sufficient work space before starting maintenance work. (See 8-13-1 Ensuring Maintenance Space (Preparation for the
Maintenance of Refrigerant Circuit Parts).)
Remove the rubber spacer.
Figure 20
Figure 21
Figure 22
Severed pipe
Pipe diameter: φ12.7
ID of the pipe with an extended end: φ12.7
Cut the pipe here.
Cut the pipe with an expanded end that is included
with four-way valve (21S4b) so that the section of
the pipe excluding the extended end will be the
same length as the pipe that was removed from the
on-site pipe.
*The included pipe with an expanded end is 100
mm long. Cut it to the appropriate length.
After being removed, leave the pipes at the bottom
inside the unit.
(Once removed from the unit, it will be difficult to
re-place the pipes.)
A cap for sealing the refrigerant pipe
is included with four-way valve
(21S4b).
Replace the old cap with the one
included with the four-way valve.
0000004986.BOOK 84 ページ 2019年5月9日 木曜日 午後6時22分
Содержание City Multi CMH-WM250V-A
Страница 1: ......
Страница 11: ...GB_BS_01_G 0000005109 BOOK 2 ページ 2019年5月9日 木曜日 午前10時1分 ...
Страница 37: ...GB_BS_02_E 0000004972 BOOK 2 ページ 2019年5月8日 水曜日 午後2時48分 ...
Страница 67: ...GB_BS_03_E 0000004974 BOOK 2 ページ 2019年5月9日 木曜日 午後6時11分 ...
Страница 91: ...GB_BS_04_E 0000004976 BOOK 2 ページ 2019年5月8日 水曜日 午後2時57分 ...
Страница 119: ...GB_BS_05_E 0000004980 BOOK 2 ページ 2019年5月9日 木曜日 午後6時18分 ...
Страница 147: ... 5 3 Hydro Unit Control 28 chapter 5 BS_05_E 5 Control 0000004980 BOOK 28 ページ 2019年5月9日 木曜日 午後6時18分 ...
Страница 149: ...GB_BS_06_E 0000004982 BOOK 2 ページ 2019年5月8日 水曜日 午後3時4分 ...
Страница 163: ...GB_BS_07_E 0000004984 BOOK 4 ページ 2019年5月17日 金曜日 午前8時21分 ...
Страница 391: ...GB_BS_09_C 0000005077 BOOK 2 ページ 2019年5月8日 水曜日 午後3時12分 ...
Страница 409: ...GB_BS_10_E 0000004988 BOOK 2 ページ 2019年5月9日 木曜日 午前8時15分 ...
Страница 436: ......