[5-2 Outdoor Unit Control ]
BS_05_E
chapter 5 -
11
5
Cont
rol
5-2
Outdoor Unit Control
5-2-1
Overview
The outdoor units are designated as OC in the order of capacity from large to small (if two or more units have the same ca-
pacity, in the order of address from small to large).
The setting of outdoor unit can be verified by using the self-diagnosis switch (SW4).
The OC determines the operation mode and the control mode, and it also communicates with the indoor units.
5-2-2
Initial Control
When the power is turned on, the initial processing of the microcomputer is given top priority.
During the initial processing, control processing of the operation signal is suspended. (The control processing is resumed after
the initial processing is completed. Initial processing involves data processing in the microcomputer and initial setting of each
of the LEV opening. This process will take up to 5 minutes.)
During the initial processing, the LED monitor on the outdoor unit's control board displays S/W version
→
refrigerant type
→
Model and capacity
→
and communication address in turn every second.
5-2-3
Startup Control
The upper limit of frequency during the first 3 minutes of the operation is 50 Hz.
When the power is turned on, normal operation will start after the initial start-up mode (to be described later) has been com-
pleted (with a restriction on the frequency).
SW4 (SW6-10:OFF)
Display
The unit is designated as the OC: "OC" appears on the display.
ON
1
2
3
4
5
6
7
8
9
10
ON
1
2
3
4
5
6
7
8
9
10
The figure at left shows that the switches 1 through 5 are set to ON and 6 through 10 are set to OFF.
0000004980.BOOK 11 ページ 2019年5月9日 木曜日 午後6時18分
Содержание City Multi CMH-WM250V-A
Страница 1: ......
Страница 11: ...GB_BS_01_G 0000005109 BOOK 2 ページ 2019年5月9日 木曜日 午前10時1分 ...
Страница 37: ...GB_BS_02_E 0000004972 BOOK 2 ページ 2019年5月8日 水曜日 午後2時48分 ...
Страница 67: ...GB_BS_03_E 0000004974 BOOK 2 ページ 2019年5月9日 木曜日 午後6時11分 ...
Страница 91: ...GB_BS_04_E 0000004976 BOOK 2 ページ 2019年5月8日 水曜日 午後2時57分 ...
Страница 119: ...GB_BS_05_E 0000004980 BOOK 2 ページ 2019年5月9日 木曜日 午後6時18分 ...
Страница 147: ... 5 3 Hydro Unit Control 28 chapter 5 BS_05_E 5 Control 0000004980 BOOK 28 ページ 2019年5月9日 木曜日 午後6時18分 ...
Страница 149: ...GB_BS_06_E 0000004982 BOOK 2 ページ 2019年5月8日 水曜日 午後3時4分 ...
Страница 163: ...GB_BS_07_E 0000004984 BOOK 4 ページ 2019年5月17日 金曜日 午前8時21分 ...
Страница 391: ...GB_BS_09_C 0000005077 BOOK 2 ページ 2019年5月8日 水曜日 午後3時12分 ...
Страница 409: ...GB_BS_10_E 0000004988 BOOK 2 ページ 2019年5月9日 木曜日 午前8時15分 ...
Страница 436: ......