![Mitsubishi Electric A173UHCPU Скачать руководство пользователя страница 197](http://html.mh-extra.com/html/mitsubishi-electric/a173uhcpu/a173uhcpu_programming-manual_238567197.webp)
7. POSITIONING CONTROL
7
−
50
(4) Operation timing
The operation timing for circular interpolation control using center point
designation is shown below.
V
Servo program No.51
PLC ready (M2000)
All axes servo start command
(M2042)
All axes servo start accept frag
(M2049)
Positioning start command
(X000)
SVST instruction
Axis 1 start accept flag
(M2001)
Axis 2 start accept flag
(M2002)
(5) Servo program
The servo program No. 51 for circular interpolation control using center point
designation is shown below.
Circular interpolation control using center point
designation
⋅
Axis used
¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥¥
Axis 1,Axis 2
⋅
End point address
Positioning speed
¥¥¥¥¥¥¥¥
1000
Center point address
<K
51>
ABS
Axis
1,
78541
Axis
2,
30000
Speed
@
1000
Center
point
1,
45000
Center
point
2,
20000
Axis
1
¥¥¥¥
78541
Axis
2
¥¥¥
30000
Axis
1
¥¥¥¥
45000
Axis
2
¥¥¥
20000
(6) Sequence program
The sequence program which runs the servo program is shown below.
0
CIRCUIT END
M2000
SVST
2
4
11
13
M9039
M9074
X000
M51
M9074
M9074
M53
M2049 M9076
M2001
M2042
PLS
SET
RST
M51
M53
M53
51
K
J1J2
M2002
Turns ON PLC ready.
Turns ON servo program No.51
start command flag (M53) when
X000 turns OFF ON.
Turns ON all axes servo start
command.
Servo program No.51 execution
request.
Turns OFF M1 on completion
of sarvo program No.51 execution
request.