Wall formwork
Mammut 350
The lifting hook (Figures. 67.1
and 67.2) can be used with any
4-rope crane sling on the con-
struction site to transport panel
stacks. Always use four hooks at
once. To calculate the permissible
load-bearing capacity, assume
that only two hooks are used.
Attention
A lifting hook must only be used
if its eccentric is easy to turn or
falls automatically into the locked
position (Fig. 66.3 on page
M350-66). Never use a lifting
hook if you need force to turn its
eccentric. Turning the eccentric
with force may not lock the lift-
ing hook but only make it appear
to be in the locked position. This
may cause the lifting hook to slip
out when lifting the panel stack.
Technical data
Æ
Weight 2.0 kg
Æ
Max. load 10 kN (1 ton)
Moving panel stacks
When moving panel stacks,
make sure the panels are secured
against sliding! MEVA secures
them with safety bolts and, for
truck transport, also with ratchet
straps (see page M350-68.
Fig. 67.1
Description
Ref. No.
Lifting hook 60 .....................
29-401-40
Lifting hook 60
Fig. 67.2
M350-67