Wall formwork
Mammut 350
Formwork assembly and stripping
Working scaffold
The plug-in walkway bracket
(Fig. 64.1) is used to support the
working scaffold. The maximum
bracket spacing for a load of
150 kg/ m² (platform group 2) is
2.50 m as defined in DIN 4420.
The planking must be at least
4.5 cm thick.
The planking and walkway
bracket can be firmly con-
nected. Do not install any planks
before securing the formwork
with push-pull props or before
tying the inside and the outside
formwork.
Do not forget to attach a side
railing to the working scaffold.
Pouring concrete
Once you have placed, tied,
braced and closed the formwork,
you can start pouring concrete.
When doing so, observe the
permissible rate of placing taking
the setting behaviour and the
consistency of the cement into
account (see page M350-10).
Fig. 64.1
Fig. 64.2
M350-64
Technical Instruction Manual / Status November 2018