Chapter 9: Meridian Link/CCR interface cabling
211
Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide
Use the following procedure to cable to external equipment.
Figure 56
IPE shelf I/O panels (Options 21Ð81)
Left I/O panel
S
R
N
M
U
T
L
K
Right I/O panel
F
E
D
C
H
G
A
B
J4
J2
J5
J3
1
Ensure that the power for the IPE Module is turned off.
2
Connect the NT1R03AA and NT1R03BA octopus cables to the I/O
panel; the specific connectors depend on the location of the IPE
Module. Tables 70 and 71 list the connectors to use for various
locations of the IPE Module. For example, if the IPE Module is in
slots 0 through 3, connect the NT1R03AA cable to connector D, and
the NT1R03BA cable to connector A.
Содержание Link/Customer Controlled Routing
Страница 2: ...ii 553 3202 210 Standard October 1998...
Страница 4: ...iv Publication history 553 3202 210 Standard October 1998...
Страница 14: ...xiv Contents 553 3202 210 Standard October 1998...
Страница 56: ...38 Chapter 3 Overview of Customer Controlled Routing 553 3202 210 Standard October 1998...
Страница 132: ......
Страница 168: ...150 Chapter 8 Hardware installation procedures 553 3202 210 Standard October 1998...
Страница 388: ...370 Chapter 13 Meridian Mail configuration 553 3202 210 Standard October 1998...
Страница 496: ...478 Chapter 14 Software installation upgrade and update procedures 553 3202 210 Standard October 1998...
Страница 562: ...544 Chapter 19 Single Terminal Access 553 3202 210 Standard October 1998...
Страница 570: ...552 Chapter 20 Ordering 553 3202 210 Standard October 1998...