116
Chapter 7: Unpack and inspect hardware
553-3202-210 Standard October 1998
¥
Store circuit packs in a clean, dry area.
¥
When tape cartridges have been subjected to temperature extremes,
allow them to stabilize to room temperature before unpacking. This
prevents the accumulation of condensation on the tapes.
!
CAUTION
Risk of equipment damage
Wear an antistatic wrist strap when handling
components. As an additional safety measure, handle
components by their edges and, whenever possible, with
the loosened packing material still around them.
Receiving the IPE Module and Application Module
components
Use the following procedure to check all items received against the order
form and shipper attached to each carton.
1
Remove each item from the carton.
2
Compare each itemÕs part number against the part number listed on
the shipper.
3
Verify that the shipped quantity and the quantity received match.
4
Verify that the order quantity on the shipper matches the shipped
quantity.
5
Report all discrepancies to your Nortel support personnel. Use the
NTI number in the top right corner of the shipper as a reference.
Содержание Link/Customer Controlled Routing
Страница 2: ...ii 553 3202 210 Standard October 1998...
Страница 4: ...iv Publication history 553 3202 210 Standard October 1998...
Страница 14: ...xiv Contents 553 3202 210 Standard October 1998...
Страница 56: ...38 Chapter 3 Overview of Customer Controlled Routing 553 3202 210 Standard October 1998...
Страница 132: ......
Страница 168: ...150 Chapter 8 Hardware installation procedures 553 3202 210 Standard October 1998...
Страница 388: ...370 Chapter 13 Meridian Mail configuration 553 3202 210 Standard October 1998...
Страница 496: ...478 Chapter 14 Software installation upgrade and update procedures 553 3202 210 Standard October 1998...
Страница 562: ...544 Chapter 19 Single Terminal Access 553 3202 210 Standard October 1998...
Страница 570: ...552 Chapter 20 Ordering 553 3202 210 Standard October 1998...