Chapter 14: Software installation, upgrade, and update procedures
455
Meridian Link Release 5C/CCR Release 3C Installation and Upgrade Guide
Procedure 7: Reboot and go through setup (continued)
11
You are prompted to change the date and time. If you do not wish to
change the date and time, type
n
, press [Return], and proceed to
step 17. If you wish to change the date and time, type
y
and press
[Return].
Figure 213
Month prompt
Month default 06 (1-12):
12
When prompted, type the number corresponding to the current
month and press [Return].
Figure 214
Day prompt
Day default 29 (1-31):
13
When prompted, type the day and press [Return].
Figure 215
Year prompt
Year default 93 (70-99):
14
When prompted, type the year and press [Return].
Figure 216
Hour prompt
Hour default 09 (0-23):
15
When prompted, type the hour and press [Return].
Figure 217
Minute prompt
Minute default 37 (0-59):
Содержание Link/Customer Controlled Routing
Страница 2: ...ii 553 3202 210 Standard October 1998...
Страница 4: ...iv Publication history 553 3202 210 Standard October 1998...
Страница 14: ...xiv Contents 553 3202 210 Standard October 1998...
Страница 56: ...38 Chapter 3 Overview of Customer Controlled Routing 553 3202 210 Standard October 1998...
Страница 132: ......
Страница 168: ...150 Chapter 8 Hardware installation procedures 553 3202 210 Standard October 1998...
Страница 388: ...370 Chapter 13 Meridian Mail configuration 553 3202 210 Standard October 1998...
Страница 496: ...478 Chapter 14 Software installation upgrade and update procedures 553 3202 210 Standard October 1998...
Страница 562: ...544 Chapter 19 Single Terminal Access 553 3202 210 Standard October 1998...
Страница 570: ...552 Chapter 20 Ordering 553 3202 210 Standard October 1998...