![Meridian Link/Customer Controlled Routing Скачать руководство пользователя страница 210](http://html1.mh-extra.com/html/meridian/link-customer-controlled-routing/link-customer-controlled-routing_installation-and-upgrade-manual_1774067210.webp)
192
Chapter 9: Meridian Link/CCR interface cabling
553-3202-210 Standard October 1998
NT8D11 backplane cable reroutingÑto accommodate the IPE
Module in PE slots 0Ð3
With the cables located as shown in Table 64, use the following procedure
to reroute the backplane cables. Note that an IPE Module located in slots
0Ð3 uses I/O connector ports A and D.
1
Leave cable A in slot position L0.
2
Remove cable C from the backplane and connect cable ends C-1,
C-2, and C-3 to slot positions L3-1, L3-2, and L3-3.
3
Move the C connector on the I/O panel to position D. Now the cable
designation is changed from C to D.
!
CAUTION
Risk of hardware damage
With this cable rerouting, the IPE Module can be used
only in PE slots 0Ð3. Also, when the IPE Module is not
in PE slots 0Ð3, PE slot 2 should not be used at all.
Содержание Link/Customer Controlled Routing
Страница 2: ...ii 553 3202 210 Standard October 1998...
Страница 4: ...iv Publication history 553 3202 210 Standard October 1998...
Страница 14: ...xiv Contents 553 3202 210 Standard October 1998...
Страница 56: ...38 Chapter 3 Overview of Customer Controlled Routing 553 3202 210 Standard October 1998...
Страница 132: ......
Страница 168: ...150 Chapter 8 Hardware installation procedures 553 3202 210 Standard October 1998...
Страница 388: ...370 Chapter 13 Meridian Mail configuration 553 3202 210 Standard October 1998...
Страница 496: ...478 Chapter 14 Software installation upgrade and update procedures 553 3202 210 Standard October 1998...
Страница 562: ...544 Chapter 19 Single Terminal Access 553 3202 210 Standard October 1998...
Страница 570: ...552 Chapter 20 Ordering 553 3202 210 Standard October 1998...