©
2014 Magnum Energy, Inc.
Page 43
Menu Maps
SETUP
continued….
[Status/Fault]
03 Charger Setup
03D Absorb Done
Time = 2.0 Hrs
01 Temperatures
Press SELECT
TECH
01 Temperatures
Inv BTS ###F
TECH button menu map continues on next page
02 Versions
Press SELECT
02 Versions
Inverter: #.#
Read Only displays
Set Absorb Done
Time
Set Absorb Done
Amps
Set Absorb Done
Time = 2.0 Hrs
Set Absorb Done
SOC
Set Absorb Done
Amps = 20 ADC
[Status/Fault]
05 BMK Setup
[Status/Fault]
04 AGS Setup
03F Max Charge
Time = 12.0 Hrs
Set Max Charge
Time = 12.0 Hrs
03G Final Charge
Stage = Multi
Set Final Charge
Stage = Multi
Set Rebulk
Volts = 12.0
03E Max Charge
Rate = 100%
Set Absorb Done
SOC = 100%
Refer to AGS SETUP menu maps in
Section 7.2.5
Refer to BMK SETUP menu maps in
Section 8.2.3
R
P
P
P
P
R
R
P
P
R
R
R
P
P
R
R
P
R
[Status/Fault]
06 PT Setup
Refer to PT SETUP menu maps in
Section 10.2.3
R
continued….
P
0.1-25.5 Hrs
P
R
R
0-250 ADC
R
50%-100%
R
Set Max Charge
Rate = 100%
0%-100%
R
OFF, 0.1-25.5 Hrs
R
Float
Silent
P
R
12.0-16.0 VDC
03H EQ Reminder
Days = OFF
Set EQ Reminder
Days = OFF
R
OFF, 1-255 Days
R
R
Inv BTS ###F
Inv Tfmer ###F
Inv FETs ###F
AGS Sensor ###F
ACLD Temp ###F
PT BTS ###F
PT FETs ###F
PT Inductor ###F
R
Remote: 4.0
AGS: #.#
BMK: #.#
Router: #.#
ACLD: #.#
PT: #.#
Figure 4-4, SETUP/TECH Button Menu Maps