©
2014 Magnum Energy, Inc.
Page 117
Using a PT Controller: Operation/Monitoring
Figure 10-7, PT Charge Controller SETUP Menu Map
SETUP
[Status/Fault]
06 PT Setup
SETUP button menu map continues on next page
R
06A Battery Type
Flooded
Set Battery Type
Flooded
Set CV Chg Done
Time = 2.0 Hrs
Set Max Charge
Amps = 200 ADC
Set Max CC/CV
Time = 12.0 Hrs
P
P
R
R
GEL, AGM1, AGM2,
Custom, CC/CV
R
Set Float
Volts = 13.2
Set Absorb
Volts = 14.4
Set EQ Done
Time = 4.0 Hrs
Set EQ
Volts = 15.6
P
P
R
R
R
12.0 – 16.6 VDC
12.0 – 16.6 VDC
12.0 – 16.6 VDC
0.1 – 25.5 Hrs
R
P
P
Set CV Charge
Volts = 13.8
P
Set CV Chg Done
Time
P
R
OFF, 20-990 ADC
R
R
Hold CV Chg VDC
Amps
Set Recharge
Volts = 12.0
Set CV Chg Done
Amps = 20 ADC
P
P
12.0-16.6 VDC
0-250 ADC
0.1-25.5 Hrs
R
R
0.1-25.5 Hrs
9.0-16.0 VDC
P
06B Absorb Done
Time = 2.0 Hrs
Set Absorb Done
Time
Set Absorb Done
Amps
Set Absorb Done
Time = 2.0 Hrs
Set Absorb Done
SOC
Set Absorb Done
Amps = 20 ADC
Set Absorb Done
SOC = 100%
P
R
P
0.1-25.5 Hrs
P
R
R
0-250 ADC
R
50%-100%
R
P
P
P
R
06C Max Charge
Rate = 100%
Set Max Charge
Rate = 100%
06D Max Charge
Time = 12.0 Hrs
Set Max Charge
Time = 12.0 Hrs
P
P
R
0%-100%
R
OFF, 0.1-25.5 Hrs
R