System Start-Up Checklist for Electrical Contractor
Important Note:
To ensure that the
LCP128
System is ready for Start-Up, please complete the following checklist.
The
LCP128
panel(s) and control station(s) have been mounted in accordance with the installation instructions.
Control stations have been wired to the panel in accordance with installation instructions.
Feed and load wiring to panel have been installed in accordance with the installation instructions.
All load circuits have been activated in bypass mode (bypass jumpers installed) and are correctly and
permanently lamped.
Bypass jumpers have been removed and all circuits activated as default Non-Dim load type.
Load schedule for each panel has been completed.
Correct load type for each circuit has been determined and recorded.
When the above checklist is completed, please fax this sheet along with the completed load schedule
for each panel to Lutron Field Service Scheduling at (610) 282-0298.
Signature: ___________________________
Job Name: _________________________________________
Today’s Date: _________________________
Lutron Job Number: _________________________________
Printed Name: _______________________
Scheduled Startup Date: _____________________________
Phone Number: _______________________
Scheduled Startup Time: _____________________________
Fax Number: _________________________
Job Site Number: ___________________________________
Bill of Material (panels, control stations, etc.):
____________________________________
Qty. ___________
____________________________________
Qty. ___________
____________________________________
Qty. ___________
Lutron Electronics Co., Inc.
7200 Suter Road
Coopersburg, PA 18036-1299
Telephone: 800-523-9466 (Listen to menu for scheduling)
System Start-Up Checklist