
363-205-401
Power Up: DLP-512
Issue 7, March 1997
Page 3 of 4
Figure 2 – Battery Placement and Connections
9.
Does meter indicate greater than 45.0 volts DC?
If YES, then proceed to Step 18.
If NO, then continue with Step 10.
10. Check battery lead connections at battery shelf.
11. Does meter indicate greater than 45.0 volts DC?
If YES, then proceed to Step 18.
If NO, then continue with Step 12.
SHELF
BATTERY
FRONT COVER
BATTERIES
KS-21906, L4
LEAD JACKS
BATTERY
ED7C678-( )