42
ULM.0.01.000RE_10_08_20
Upon the connection completion, it is recommended to conduct the completed work
quality inspection with regard to the following items:
- if there are any cable damages;
- if there are any mechanical stresses due to the cable tension;
- cable glands are properly installed, tightened and sealed;
- device casing cover is installed and tightened.
Содержание ULM-31-HF
Страница 28: ...28 ULM 0 01 000RE_10_08_20 Fig 4 12 Examples of Installation ...
Страница 74: ...74 ULM 0 01 000RE_10_08_20 12 5 Mounting of ULM 31А1 level transmitter at the stub tube ...
Страница 76: ...76 ULM 0 01 000RE_10_08_20 12 7 Mounting of ULM 31 HF ULM 31А1 HF level transmitters at the stub tube ...
Страница 77: ...77 ULM 0 01 000RE_10_08_20 12 8 Mounting of ULM 31А1 level transmitter at the stub tube with insulating spacer ...
Страница 83: ...83 ULM 0 01 000RE_10_08_20 12 14 Mounting flange ...