Installation
17
Install
ation
2
M6 * 2
< Installing the plate and inverter on a wood stud wall >
A
Using the mounting plate as a template, mark four screw holes onto the wall. For 16" (40.6 cm)
on center stud mounting, use the four holes that are indicated for this purpose in the figure.
Make sure at least two of the holes are in the center of a stud before marking the drill location.
B
After marking the screw hole locations, drill the pilot holes for the appropriate screw type
that will hold the weight of the inverter in the selected material. 1/4“ (6 mm) lag bolts are
recommended for mounting on wood framed walls.
C
Align the mounting plate over the pilot holes and install the mounting hardware to the
mounting surface. Please tighten to the recommended torque necessary to hold the mounting
plate firmly to the wall surface type.
D
As the inverters are heavy, they should be lifted out of the cardboard container by at least two
persons.
E
With at least one person on each side of the inverter, lift it up and place it carefully onto the
mounting plate. Install two screws in the bottom bracket on the inverter to secure the device.
F
Check that the inverter is seated securely on the wall.
It is recommended to use stainless steel screws, especially if installed outdoors. Verify sheer and
pull-out strength of anchors or other wall attachments.
Содержание A005KEEN261
Страница 74: ......