Operation
52
Oper
ation
3
Commissioning the PV system
WARNING
Read all of these instructions, cautions, and warnings for the LG Electronics ESS inverter and
associated PV array documentation.
WARNING
Installation and commissioning must be performed by a licensed electrician in accordance with
local, state, and National Electrical Code ANSI/NFPA 70 requirements.
WARNING
Verify that the dedicated 2-pole 240 V AC or 208 V AC circuit breaker in the building electrical
service panelboard is turned off.
NOTICE
Disconnect in the [OFF] position, and the PV input polarity once more simply by carefully using
a 600 V DC rated digital volt meter and probing the positive (+) and negative (-) PV array
connections.
LED Indication
There are five LEDs in the front side of the inverter.
< LED Logo >
LED Status
Label
Designation:
Color
Operation(OPER)
Green
Battery(BAT)
Red / Green / Yellow
Wireless
Communication (COMM)
Red / Green / Yellow
Information (INFO)
Red / Green / Yellow
Fault (FAULT)
Red
Содержание A005KEEN261
Страница 74: ......