Installation
41
Install
ation
2
ATS wire connections
INFO
Before the ATS connection need to install a secondary AC panel for backed-up loads (not supplied
by LGE). Rewire the backed-up loads through this panel.
A
Open the cover
y
Unscrew the 4 screws on cover with a Torx20
screwdriver and remove the cover.
y
Recommended screw torque: 18 in-lbs (2 Nm).
B
Remove the hole tapes for installing conduit.
y
AC bypass switch is on [NORMAL] status, do not
change status when mounting and wiring.
y
2x 3/4” conduit holes are provided.
0.7”
(1.78 cm)
C
AC Wires connection: Install 3/4“ (1.78 cm) conduit into
the conduit hole.
D
Route AC wires through the conduit and strip the wire
end to 3/4“ (1.78 cm).
Inverter
L1 N L2
Grid
L1 N L2
Load
L1 N L2
E
Use a 3/16” (5 mm) flat blade
screw driver to push the spring
of each terminal and connect
the wires (L1, N, L2) to the
connectors according to the
marks.
NOTICE
Clearly distinguish between grid and backup load connections. If there are multiple inverters in the
installation, each inverter should be connected to a separate backed-up loads panel. Do not share
backup output between inverters.