Chapter 12. TROUBLE SHOOTING
12 - 10
Output circuit troubles and corrective actions(continued)
Condition
Cause
Corrective Action
The load off response
time is long
•
Over current at Off state
[The large solenoid current fluidic load
(L/R is large) such as is directly driven
with the transistor output
•
The off response time can be delayed
by one or more second as some loads
make the current flow across the diode
at the off time of the transistor output
•
Insert a small L/R magnetic contact
and drive the load using the same
contact
Output transistor is
destroyed
Surge current of the white lamp
A surge current of 10 times or more
when turned ON.
•
To suppress the surge current make
the dark current of 1/3 to 1/5 rated
current flow
Содержание GLOFA GM6 Series
Страница 1: ...U s e r s M a n u a l LG Programmable Logic Controller GLOFA GM6 Series L G Industrial Systems ...
Страница 2: ... CONTENTS ...
Страница 178: ...Chapter 15 The PID functions 15 24 Example program of 15 4 3 1 ...
Страница 179: ...Chapter 15 The PID functions 15 25 Example program of 15 4 3 2 continue to next page ...
Страница 180: ...Chapter 15 The PID functions 15 26 Example program of 15 4 3 2 continued ...
Страница 209: ...Appendix 4 Outer Dimensions APP4 3 ...