background image

 

 

 

 

 

 

 

 

 

 

 

 

 

A product of: 

 

OPERATOR’S MANUAL 

 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 

 

 

ALL 
VERSIONS

 

OGI# 460346 SOLAR POWER  
OGI# 460347 100-240 VAC 
OGI# 460348 12-24 VDC 

 

When you purchase a TotalArc BMS 

you purchase a product of “Quality, integrity, and innovation from concept to 

commissioning.” That promise, along with proper maintenance, will ensure that your TotalArc BMS gives you years of 
rugged, trouble-free performance. Thank you for your purchase. 

SAVE THIS MANUAL FOR FUTURE REFERENCE

 

WARNING: 

To reduce the risk of injury, the user must read and understand the 

operator’s manual before using 

this product.

 

Содержание TotalArc BMS 460346 SOLAR POWER

Страница 1: ...lity integrity and innovation from concept to commissioning That promise along with proper maintenance will ensure that your TotalArc BMS gives you years of rugged trouble free performance Thank you f...

Страница 2: ...CATOR LIGHT 3 IGNITION PUSH BUTTON 4 GREEN STATUS INDICATOR LIGHT 5 TOTALARC ENCLOSURE 6 TOTALARC MAIN GAS VALVE 7 TOTALARC PILOT GAS VALVE 8 TEMPERATURE CONTROL PRESSURE SWITCH 9 CUSTOMER POWER ENTRY...

Страница 3: ...II FIGURE 2 IGNITION MODULE Installation in Flame Arrestor For details see Installation instructions on page 7...

Страница 4: ...3A INSTALLATION TotalArc kit includes mounting feet for easy installation For details see Installation instructions on page 6 FIGURE 3B MOUNTING HOLE DIMENSIONS MOUNTING PATTERN FOR TOTALARC BMS SYSTE...

Страница 5: ...IV FIGURE 4 Clamshell Installation FIGURE 5 Battery Connection Detail SOLAR OPTION ONLY...

Страница 6: ...V FIGURE 6 Ignition Rod Installation...

Страница 7: ...VI FIGURE 6 Ignition Rod Installation FIGURE 7 ASCO Flow Diagrams...

Страница 8: ...VII Figure 8 Solar Panel Assembly...

Страница 9: ...VIII Figure 9 Solar Panel Assembly...

Страница 10: ...VIIII Figure 10 Tubing Diagram For more details see P ID in Operations Section...

Страница 11: ...portant Safety Instructions 2 Symbols 3 4 Electrical 4 Features 5 Assembly 5 7 Operation 8 9 Maintenance 10 Trouble Shooting 11 12 Wiring Diagrams 13 14 Warranty 15 Parts Ordering and Service Back Pag...

Страница 12: ...r sources Confirm power availability at installation site and select one of the following models OGI Part 460346 Solar Powered System This system is provided with a solar panel and all required instal...

Страница 13: ...prior to power up stage Use only the manufacturer s replacement clam shells cables and battery Keep the area around the enclosure clear and free of debris to allow proper air flow around the enclosure...

Страница 14: ...used on this product Please study them and learn their meaning Proper inter pretation of these symbols will allow you to operate the product better and safer SYMBOL NAME DESIGNATION EXPLANATION Safet...

Страница 15: ...DC at 25 C OGI PART 460347 VAC Powered Control Panel Nominal System Voltage 85 264 VAC Rated Current Input 1 35A at 120 VAC 0 65A at 230 VAC OGI PART 460348 VDC Powered Control Panel Nominal System Vo...

Страница 16: ...or damage occurred during shipping Carefully remove the product and any accessories from the box Make sure that all items listed in the packing list are included Donotdiscardthepackingmaterialuntilyo...

Страница 17: ...gure 4 pg IV These shells are required to maintain Class 1 Division 2 rating Failure to apply clam shells could lead to a hazardous work environment Do NOT connect or disconnect cable assembly while p...

Страница 18: ...the position is set tighten the set screw Ground connection remove one side of the metal clamp holding the ceramic insulator and install provided 12AWG THHN green ground wire with terminal connector...

Страница 19: ...nd timer starts a During the 10 second timer the Green Status indicator will fade on and off indicating that the TotalArc BMS is proving the pilot b If the pilot is not proven a flame failure event wi...

Страница 20: ...OR HEAT OCCURS WHEN UNIT IS WAITING FOR A CALL FOR HEAT EITHER AFTER REACHING TEMPERATURE OR ON INITIAL START UP GREEN LIGHT RAPID FLASH IGNITION IN PROGRESS PILOT VALVE ENGAGED IGNITION ROD ASSEMBLY...

Страница 21: ...OPERATION 9 TYPICAL HEATER WITH TOTALARC BMS P ID ARRANGEMENT...

Страница 22: ...und connection at pilot assembly e Visually check the Control Panel and instrumentation for moisture condensation connections etc f In Northern locations where snow accumulation could be a problem cle...

Страница 23: ...a meter set to DC voltage by putting the red lead into terminal block TS1 13 and the black lead into terminal block TS1 15 Confirm gas pressure is maintained even after pilot valve opens Confirm prope...

Страница 24: ...at the solar panel terminations power source can not be disconnected since it comes directly from solar panel Follow proper procedures while performing this test o If proper voltage readings are foun...

Страница 25: ...N 460346 NOTE Only Solar Systems have a FU2 due to remote battery enclosure 120VAC POWER TOTALARC P N 460347 12 24VDC POWER TOTALARC P N 460348 TSI TERMINAL STRIP LOCATED IN BATTERY ENCLOSURE TS2 TER...

Страница 26: ...SCHEMATICS 14 Enclosure Connections for all systems...

Страница 27: ...SCHEMATICS 15 Enclosure Connections for all systems CONT...

Страница 28: ...nufacturer s warranty and Seller must authorize return of such material prior to its return shipment Buyer shall bear the expense of packing and shipping proposed defective parts and components and th...

Отзывы: