104
Programs
Leica TPS800-4.0.0en
Description of fields
Chainage
Current measured chainage.
Offs. Hng
Offset to Hinge, the current measured
offset to horizontal alignment
including offset right and offset left.
S
H Hng
Height difference to Hinge, the
vertical offset between current
defined height at current chainage
and current measured position
including defined height difference.
PtID :
P5
hr :
1.500 M
Offset :
Left
Chainage :
92.000 m
Offs.Hng :
-24.298 m
H Hng :
17.554 m
Act. Slp : 1: 1.384 v:h
IR
I
ALL
DIST
REC
SLOPE CHECK HINGE Values 1/3
Hng
Slope distance to Hinge, the slope
distance from the current measured
point to the hinge point.
Offs. Aln
Offset to Alignment, the current
measured offset to horizontal align-
ment excluding offset right and offset
left.
S
H Aln
Height difference to alignment, the
vertical offset between defined height
at current chainage and current
measured position excluding defined
height difference.
Aln
Slope distance to Alignment, slope
distance from the current measured
point to the alignment.
Act. Slp
Actual Slope, the current measured
slope of the reflector position to the
hinge point.
Height
Height value of the current measured
point.