85
Programs
Leica TPS800-4.0.0en
Construction
This application allows to define a construction site
by combining set-up of the instrument along a
construction line, measuring and stake out points in
relation to the line.
After selecting the application you have two
options:
a) Defining a new construction site
or
b) Continue with previous site (skips set-up)
Procedure:
Defining new site:
1. Measure line Start point [ALL], [DIST]+[REC]
2. Measure second line point [ALL], [DIST]+[REC]
)
In case, you have entered coordinates by
ENH and measured to known points a plausibility
check informs you about the calculated line length,
the actual length and the difference.
As built check:
This dialog shows you the
S
Line,
S
Offset and
S
Height of a measured point in relation to the line.
[ShiftLn]
Allows you to enter values for
shifting the line.
[LAYOUT]
Switches to Layout-mode.
S
Line is positive:
Measured point is in direction from line start - to line
end point.
S
Offset is positive:
Measured point is right of line.
S
Height is positive:
Measured point height is above line start point’s
height.
LAYOUT ALL
PtID :
A11
hr :
1.500 m
:
7.225 m
Off:
10.194 m
:
-1.673 m
AS-BUILT CHECK