KW Aufzugstechnik GmbH Inbetriebnahme DAVID-613
DAVID-D613-Inbetriebnahme-V124-EE 18.02.2022 Seite - 40 -
62
Connection of the 7-pole external
call line (external panels)
Attention! The external panels may only be connected when
they are not under tension! The terminal for connecting the
panels can be found on the ER2013 or ER2014 floor computer
(wiring diagram, sheet 6 of 8 / columns 1-8).
Lead the landing call cable in the cable duct to the floor com-
puter. The sockets for the plugs are located at the top and bot-
tom.
7-pin connector At the bottom of the floor computer
Clamp Function
Pin Plug 7p
500
Control ground 0V DC
1
2xA
Outside Call Door Page 1
2
2xB
Outside Call Door Page 1
3
97A
Floor arrow door side 1 Up
4
98A
Floor arrow door side 1 Down 5
PZ1
Piezosummer Tür Seite 1
6
200
Piezo buzzer door page 1
7
7-pin connector At the top of the floor computer
Plug 7p
Pin
Clamp
Function
7
200 Control v24V DC
6
PZ2 Piezo buzzer door page 2
5
98B Floor Arrow Door Page 2 Down
4
97B Floor Arrow Door Page 2 Up
3
2xD Outside call Door Page 2 From se-
2
2xC Outside call Door Page 2 On selec-
1
500 Control ground 0V DC