![KW DAVID-613 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/kw/david-613/david-613_manual_2013611004.webp)
KW Aufzugstechnik GmbH Inbetriebnahme DAVID-613
DAVID-D613-Inbetriebnahme-V124-EE 18.02.2022 Seite - 4 -
STEP 56
Shafttop - Connection of the Distance-Limiter-/Emergency-End-Switch Top 1 & 2
22
STEP 57
Shafttop - Connecting of the remote control and reset speed cabin
22
STEP 58
Shafttop - Connecting of the remote control and reset speed cabin
22
STEP 59
Shafttop – Connection of the door unlocking contacts of the shaft doors S.9.2 to S.9.n at VSK
23
STEP 60
Shaft - Mounting of the Hanging cables
23
STEP 61A
Assembly Instruction for Shaftbus with Remotestations ER-2013
24
STEP 61B
Assembly Instruction for Shaftbus with Remotestations ER-2014
32
STEP 62
Connection of the 7-pole Landing-Call-Wire
40
STEP 63
Shaft – Connection of the KW TFT-Displays
41
STEP 64
Shaft – Connection of the KW-Matrix-Displays
41
STEP 70
Principle picture - connection of the devices on the car roof
42
STEP 71
Carroof - assembly of the inspection box
42
STEP 72
Carroof - mounting the Hanging-Wire on the Cabin
43
STEP 73
Carroof - Connection of the Hanging-Wire on the Cabin
43
STEP 74
Carroof – Connection of the Safetygear-Contact
43
STEP 75
Carroof – Connection of the Low-Restrictor-Weight-Contact - 1
43
STEP 76
Carroof – Connection of the Low-Restrictor-Weight-Contact – 2
43
STEP 77
Carroof – Connection of the Carroof-Opening/ Car-Position-Contact
43
STEP 78
Carroof - connection of the SiKr. isolator (hydraulics 2:1)
44
STEP 79
Carroof – Connection of the Inspection-End-Switch
44
STEP 80
Carroof – Connection of the Folder-Railing-Switch - 1
44
STEP 81
Carroof –
Connection of the Folder-Railing-Switch - 2
44
STEP 82
Carroof - connection of the folding railing signal c24V
44
STEP 83
Carroof - connection of the shelter light H22 VSK
44
STEP 84
Carroof – Connection of the Car-Door-Contacts
45
STEP 85
Carroof – Connection of the Car-Light
45
STEP 86
Carroof – Connection of the Car-Fan
45
STEP 87
Carroof – Connection of the Powersupply of Loadmeasurement-Unit / Photocells
45
STEP 88
Carroof - Connection of the Powersupply Door-Engines 230V AC
45
STEP 89
Carroof - connection of door commands Door operator(s)
45
STEP 90
Car roof - connection of CANOpen door drive(s)
46
STEP 91
Carroof – Connection of the 400V AC Door-Engine
46
STEP 92
Carroof – Connection of the Photocell Door-1, Door-2 & Door-3
46
STEP 93
Carroof – Connection of the Audiovisual Alert H69
46
STEP 94
Carroof - Connection of the Door-End-Switch, Revers-Contact
46
STEP 95
Carroof – Connection of the Bolt-Magnet-Coils
46
STEP 96
Carroof – Connection of the Cabin-Gong-Loudspeaker
47
STEP 97
Carroof – Connection of the KW-Loadmeasurement-Sensor
47
STEP 98
Carroof – Connection of the Over, Full- and Lowload-Sensorson the Cabin
47
STEP 99
Carroof - connection of CANopen load measurement
47
STEP 100
Carroof - Connection of the Car-Panels
47
STEP 101
Carroof – Connection of the KW TFT-Displays
47
STEP 102
Carroof – Connection of the KW-Matrix-Displays
47
STEP 103
Cabin roof - connection display - panel via CANOpen on the cabi
48
STEP 104
Cabin - connection of the pushbuttons on the EIT
49
STEP 105a
Carroof - mounting the
ELGO LIMAX-SAFE-CP33
52
STEP 106a
Carroof - commissioning
ELGO LIMAX SAFE CP33
55
STEP 105b
Cabinroof - mounting of the
Kübler LES02-SAFE system
63
STEP 106b
Cabinroof - Commissioning
KÜBLER-SAFE
65
STEP 107a
ANTS-SAFE instructions for ANTS-ASA2-ASE & Kübler-PSU-LES02 (TÜV)
74
STEP 107b
LIMAX-SAFE instructions for LIMAX SAFE CP33 (TÜV)
75
STEP 108
Functional test – Detection of an unintended car movement EN 81-20
77
STEP 109
Inspector - Session
78
STEP 110
Checklist of safety functions after the learning trip
83