Determine What:
What Subsystem is Respon-
sible for the Failed Sequence
Step
.
Analyze
the subsystem:
Check the Load.
Check the Position Feed Back.
Check the Positioning System
TABLE 6-1.
Typical KVAL Machine Sequence
Typical Machine
Sequence
Responsible Sub-
system
1. Move Door into Posi-
tion
Feed System
2. Clamp the Door
Door Clamp
3. Make the Cuts
Cutter Position-
ing Cutter Power
4. Unclamp the Door
Door Clamp
5. Move Door Out
Feed System
6. Wait for Next Door
Feed System
Basic Troubleshooting Steps
Determine Where:
The Sequence Step
Where
the Failure Occurs
What was the Machine Trying to Do?
What Was the Machine Trying to Do
Next?
Check the Sequences in the Table
Below.
How is the Broken Section Suppose to
Work?
What is Keeping the Broken Section From
Working?
What Part of the Machine is not Work-
ing?
Check the Subsystems in the Table
Below.
Ask
Narrow
Verify
Troubleshooting Basics
6-3
KVAL Operation/Service Manual
Содержание Edge-SS
Страница 5: ...KVAL Edge SS Operation Service Manual ...
Страница 12: ...KVAL Edge SS Line Operation Service Manual ...
Страница 30: ...How to Download the Service Application 1 18 KVAL Operation Service Manual Page Intentionally Left Blank ...
Страница 32: ...Safety Sign Off Sheet 1 20 KVAL Operation Service Manual ...
Страница 35: ...Definitions 2 45 KVAL Operation Service Manual ...
Страница 91: ...Definitions KVAL Operation Service Manual 2 56 ...
Страница 109: ...System IT Administration 4 4 KVAL Operation Service Manual ...
Страница 142: ...Collet Torque Values 5 33 KVAL Operation Service Manual ...
Страница 143: ...Troubleshooting Electrical Problems 6 30 KVAL Operation Service Manual ...
Страница 173: ......
Страница 177: ......
Страница 178: ......
Страница 179: ......