Initial Powering Operations for the Edge-SS Line
KVAL Operation/Service Manual
2-18
Home the Machine Line
The Machine Line must go through a homing routine before any operations are performed. The
homing routine sets a zero reference from which each machine measures its movement and cut-
ting process.
If power is lost or any machine is reset, the homing routine must be performed again. Each
machine has a
Home
button on it’s associated
Main Control Screen
or the entire machine line can
be
Homed
using the
Home Machine Line
button located on the
Machine Line Screen
.
How to Power Down the Machine
1.
1
2
3
Push the
Stop
button for each machine, located on the
Operator’s Station
2.
Shut down the operating system, by selecting
Shutdown
from the Desktop.
Note:
Make sure Windows is shutdown completely before
turning off the machine. Hard drive or data may be dam-
aged if not turned off in this order.
3.
Switch the green
CONTROL TRANSFORMER
switches for
each machine to the OFF position.
4.
KVAL also recommends that you turn the disconnect
switches on the electrical cabinets to OFF; this helps
reduce possible damage resulting from power surges from
electrical storms.
Содержание Edge-SS
Страница 5: ...KVAL Edge SS Operation Service Manual ...
Страница 12: ...KVAL Edge SS Line Operation Service Manual ...
Страница 30: ...How to Download the Service Application 1 18 KVAL Operation Service Manual Page Intentionally Left Blank ...
Страница 32: ...Safety Sign Off Sheet 1 20 KVAL Operation Service Manual ...
Страница 35: ...Definitions 2 45 KVAL Operation Service Manual ...
Страница 91: ...Definitions KVAL Operation Service Manual 2 56 ...
Страница 109: ...System IT Administration 4 4 KVAL Operation Service Manual ...
Страница 142: ...Collet Torque Values 5 33 KVAL Operation Service Manual ...
Страница 143: ...Troubleshooting Electrical Problems 6 30 KVAL Operation Service Manual ...
Страница 173: ......
Страница 177: ......
Страница 178: ......
Страница 179: ......