72,000 Cycle Maintenance Steps
5-12
KVAL Operation/Service Manual
72,000 Cycle Maintenance Steps
Follow Lockout Tagout procedures,
Inspect Nuts and Bolts
Inspect all nuts and bolts for tightnesses Tighten is necessary. Use appropriate tool to
verify that the hardware is tight.
Check Door Feeding Transition
Check that there is a smooth transition
with a door feeding into and out of
machine.
Feed door in and out to verify smooth tran-
sition is repeatable.
Electrical
Check all connections in each node box and electrical panel. Wires may become loose due to
vibration. Check contactors for wear.
Computer Backup
Backup computer software.
Wash Filter and Lubricator Bowls
Wash filter and lubricator bowls with
soapy water.
• Slide lock down to
unlock.
• Twist bowl to remove it.
• Remove filter from Air
filter assembly. Inspect
and clean or replace if
necessary.
• Clean bowls and reas-
semble.
Содержание Edge-SS
Страница 5: ...KVAL Edge SS Operation Service Manual ...
Страница 12: ...KVAL Edge SS Line Operation Service Manual ...
Страница 30: ...How to Download the Service Application 1 18 KVAL Operation Service Manual Page Intentionally Left Blank ...
Страница 32: ...Safety Sign Off Sheet 1 20 KVAL Operation Service Manual ...
Страница 35: ...Definitions 2 45 KVAL Operation Service Manual ...
Страница 91: ...Definitions KVAL Operation Service Manual 2 56 ...
Страница 109: ...System IT Administration 4 4 KVAL Operation Service Manual ...
Страница 142: ...Collet Torque Values 5 33 KVAL Operation Service Manual ...
Страница 143: ...Troubleshooting Electrical Problems 6 30 KVAL Operation Service Manual ...
Страница 173: ......
Страница 177: ......
Страница 178: ......
Страница 179: ......