How to Access to Bit Assemblies
5-26
KVAL Operation/Service Manual
Insert New Bit
Note:
DO NOT Bottom out Bit
If bit is bottomed out the arbor will
not tighten and could damage the
collet or other machine parts.
At Least 1/8” Clearance
3.
Lightly attach collet assembly on drill.
4.
Insert the new bit into the assembly.
5.
Before tightening the collet assembly, adjust the bit depth to the measurement taken
in step 1. Ensure there is a minimum of 1/8” clearance from the end of the bit to the
bottom of the tool holder.
6.
Tighten the collet assembly.
7.
Inspect and verify the work. Clean the work area.
Содержание Edge-SS
Страница 5: ...KVAL Edge SS Operation Service Manual ...
Страница 12: ...KVAL Edge SS Line Operation Service Manual ...
Страница 30: ...How to Download the Service Application 1 18 KVAL Operation Service Manual Page Intentionally Left Blank ...
Страница 32: ...Safety Sign Off Sheet 1 20 KVAL Operation Service Manual ...
Страница 35: ...Definitions 2 45 KVAL Operation Service Manual ...
Страница 91: ...Definitions KVAL Operation Service Manual 2 56 ...
Страница 109: ...System IT Administration 4 4 KVAL Operation Service Manual ...
Страница 142: ...Collet Torque Values 5 33 KVAL Operation Service Manual ...
Страница 143: ...Troubleshooting Electrical Problems 6 30 KVAL Operation Service Manual ...
Страница 173: ......
Страница 177: ......
Страница 178: ......
Страница 179: ......