![Krone Big Pack 1270 HS Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/krone/big-pack-1270-hs/big-pack-1270-hs_original-operating-instructions_2004791008.webp)
Foreword
8
9.11.2
Twine motion indicator upper twine (double knotter) ............................................................. 169
9.11.3
Initiate the tying process manually ........................................................................................ 170
9.12
Drives ............................................................................................................................................. 171
9.12.1
Main drive .............................................................................................................................. 171
9.13
Feed packer drum drive ................................................................................................................. 172
9.14
Knotter shaft drive .......................................................................................................................... 173
9.15
XC cutting system drive ................................................................................................................. 173
9.16
Pick-up drive with XC cutting system ............................................................................................ 174
9.17
Pick-up drive over gearbox (without XC cutting system) ............................................................... 174
9.18
MultiBale equipment (optional) ...................................................................................................... 175
10
Settings ............................................................................................................................................... 176
10.1
Tying unit ....................................................................................................................................... 177
10.1.1
Inserting the twine .................................................................................................................. 177
10.1.2
Interconnecting the twine (twine box) .................................................................................... 178
10.1.3
Threading the twine ............................................................................................................... 181
10.1.3.1
Single knotter ................................................................................................................. 181
10.1.3.2
Lower twine double knotter ............................................................................................ 182
10.1.3.3
Upper twine .................................................................................................................... 183
10.2
Setting the needles ........................................................................................................................ 184
10.2.1
Lateral setting of the needles ................................................................................................. 184
10.2.2
Setting the height of the needles on the knotter .................................................................... 185
10.2.3
Top dead centre of the needles ............................................................................................. 186
10.3
Setting the needle yoke brake ....................................................................................................... 187
10.4
Position of needles – checking / setting the baling ram ................................................................ 188
10.5
Setting the upper needle ................................................................................................................ 189
10.5.1
Checking the setting of the upper needle .............................................................................. 189
10.6
Twine bar ....................................................................................................................................... 190
10.6.1
Setting the twine bar (single knotter) ..................................................................................... 190
10.6.2
Setting the twine bar (double knotter) .................................................................................... 191
10.6.2.1
Checking the twine bar after the setting ........................................................................ 192
10.6.3
Pretension of the twine bar shaft ........................................................................................... 193
10.6.4
Setting the knotter shaft brake ............................................................................................... 193
10.7
Twine brake ................................................................................................................................... 194
10.7.1
Setting the twine tension on the upper twine strand (double knotter) ................................... 195
10.7.2
Setting the twine tension of the lower twine strand (double knotter) ..................................... 196
10.8
Knotter ........................................................................................................................................... 197
10.8.1
Locking the tying process ...................................................................................................... 197
10.8.2
Start-up .................................................................................................................................. 198
10.8.3
Single knotter ......................................................................................................................... 198
10.8.4
Knotter hook (single knotter) .................................................................................................. 198