![Krone Big Pack 1270 HS Скачать руководство пользователя страница 177](http://html1.mh-extra.com/html/krone/big-pack-1270-hs/big-pack-1270-hs_original-operating-instructions_2004791177.webp)
Settings
177
Pos: 32.4 /Überschriften/Überschriften 1/A-E/Bindeeinrichtung @ 20\mod_1239003005331_78.doc @ 225610
10.1
Tying unit
Pos: 32.5 /BA/Einstellungen/Großpackenpresse/Bindegarn einfädeln/Bindeeinrichtung allgemein HS Baureihe @ 62\mod_1299657362889_78.doc @ 573878
The BiG PACK baler is equipped with twine boxes on both sides of the machine. Each is
capable of holding 16 rolls of tying twine.
To ensure sufficient tying safety, you must be careful only to use synthetic twine that has a
running length of 100-130 m/kg.
Pos: 32.6 /BA/Einstellungen/Großpackenpresse/Bindegarn einfädeln/Hinweis Verwenden Sie nur KRONE Original Bindegarn @ 32\mod_1253083955561_78.doc @ 308448
Note
Only use original KRONE twine
Pos: 32.7 /BA/Einstellungen/Großpackenpresse/Bindegarn einfädeln/Bindegarn einlegen @ 20\mod_1239009720863_78.doc @ 226898
10.1.1
Inserting the twine
Insertion of the twine is identical for the right hand and left hand sides of the baler. The
procedure of insertion of the twines described in the following does apply for both sides of the
baler.
The preparations and insertion of the twine must be accomplished with machine at standstill:
•
Switch off tractor P.T.O. shaft
•
Switch off tractor engine
•
Fix the flywheel in place mechanically
•
Secure the knotter shaft by moving the safety lever (1)
Pos: 32.8 /BA/Einstellungen/Großpackenpresse/Bindegarn einfädeln/Knoterwelle sichern @ 20\mod_1239009186972_78.doc @ 226844
Secure knotter shaft
1
2
2
1
a
b
a
b
BP380-7-044
Fig. 113
Each time before you set new tying twine in place, the knotter shaft must be secured so that the
needle yoke cannot be put in motion.
To do this:
•
To do this, move the safety lever (1) from position (a) to position (b) and set it down on
the journal (2)
Pos: 32.9 /BA/Einstellungen/Großpackenpresse/Bindegarn einfädeln/Hinweis Abstellen des Bindegarns in die Garnkästen @ 20\mod_1239008751331_78.doc @ 226534
Note
When placing the tying twine in the twine box, make certain that the labeling on the rolls can be
read. Make certain the side marked "Up" is facing up.
Pos: 32.10 /BA/-----Seitenumbruch------ @ 0\mod_1196175311226_0.doc @ 4165