DETAILED CONTROLS AND GAUGES
OPERATION
3-18
Meter Display Portion
3
Pilot Display
3
q
The pilot display at the top of the screen consists of the pilot lamps to confirm the actuation of each function.
q
When the starting switch is turned ON, the pilot lamp lights up when the display items are functioning.
Engine Pre-heating Monitor
This monitor (1) lights up when the engine preheating electric
heater is actuated. When the ambient temperature is low and
the starting switch is set to the ON position, the lamp lights up,
and when the preheating is completed, it goes out.
The preheating time differs according to the ambient tempera-
ture.
Pilot display
Gauge and Meter
(1)
Engine pre-heating monitor
(10) Engine coolant temperature gauge
(2)
Swing lock monitor
(11) Hydraulic oil temperature gauge
(3)
Wiper monitor
(12) Fuel gauge
(4)
Auto-deceleration monitor
(13) Service meter, clock
(5)
Working mode monitor
(14) ECO gauge
(6)
Travel speed monitor
(7)
One-touch power max. monitor
(8)
Air conditioner monitor
(9)
Idle stop guidance
Содержание PC350LC-8
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Страница 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Страница 279: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section...
Страница 335: ...MAINTENANCE MAINTENANCE PROCEDURE 4 57 6 Boom cylinder foot pin 2 places 7 Boom foot pin 2 places...
Страница 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Страница 367: ...SPECIFICATIONS 15...
Страница 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Страница 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 501: ...COLOPHON 18...