OPERATION
TRANSPORTATION
3-195
5.
Pass wire ropes between the 1st and 2nd track rollers from
the front and between the 1st and 2nd track rollers from the
rear.
However, for machines equipped with a full roller guard for
the track roller, pass the wire rope under the track.
6.
Set the lifting angle (A) of the wire rope to 30° to 40°, then
lift the machine slowly.
7.
After the machine comes off the ground, check the hook
condition and the lifting posture, and then lift slowly.
Содержание PC350LC-8
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Страница 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Страница 279: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section...
Страница 335: ...MAINTENANCE MAINTENANCE PROCEDURE 4 57 6 Boom cylinder foot pin 2 places 7 Boom foot pin 2 places...
Страница 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Страница 367: ...SPECIFICATIONS 15...
Страница 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Страница 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 501: ...COLOPHON 18...