HIGH REACH DEMOLITION MANUAL
INSTALLATION AND REMOVAL
7-39
Work Equipment Flow Valve Settings
7
Ensure the work equipment flow valves are correctly set for
machine operation with high reach work equipment or dig boom.
WARNING
Incorrect setting of the flow valves can cause machine dam-
age and personal injury
High Reach Work Equipment Flow
Settings
7
With high reach work equipment fitted, adjust the flow valves to
the following settings. To adjust the flow setting rotate the body
until dim t is achieved. After setting the flow valves check that the
work equipment is operating at a safe speed. If in doubt contact a
Komatsu dealer.
(1)
(2)
(3)
(4)
(5)
Flow Control Valve Settings
Ref
Location
Dimension (t)
1
Boom Cylinder
Boom Raise
6mm
Boom Lower
6mm
2
Boom 1
Link Cyl Bottom
15.5mm
Left Rotation
5.5mm
Right Rotation
5.5mm
3
Boom 3
Link Cyl Bottom
11mm
Link Cyl Head
9mm
4
Link
Arm Cyl Head
11mm
Arm Cyl Bottom
14.5mm
5
Arm
Bucket Cyl Bottom
6mm
Bucket Cyl Head
9mm
Содержание PC350LC-8
Страница 2: ......
Страница 3: ...FOREWORD 11...
Страница 12: ...PRODUCT INFORMATION FOREWORD 1 10 SERVICE METER LOCATION 1 On top of the machine monitor...
Страница 278: ...TROUBLES AND ACTIONS OPERATION 3 214...
Страница 279: ...MAINTENANCE 14 WARNING Please read and make sure that you understand the SAFETY section before reading this section...
Страница 335: ...MAINTENANCE MAINTENANCE PROCEDURE 4 57 6 Boom cylinder foot pin 2 places 7 Boom foot pin 2 places...
Страница 366: ...MAINTENANCE PROCEDURE MAINTENANCE 4 88...
Страница 367: ...SPECIFICATIONS 15...
Страница 371: ...SPECIFICATIONS SPECIFICATIONS 5 5...
Страница 372: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Страница 432: ...SUPER LONG FRONT BOOM AND ARM ATTACHMENTS AND OPTIONS 6 60...
Страница 496: ...SPECIFICATIONS HIGH REACH DEMOLITION MANUAL 7 64...
Страница 497: ...INDEX 18...
Страница 498: ...INDEX 8 2...
Страница 501: ...COLOPHON 18...